GEOTHERMAL
We are confident that our equipment, personnel and experience combine to ensure each project receives the highest level of detail and care. We have a strong record of staying on schedule and on budget.
DELIVERING RESULTS
You can have full confidence that the personnel and equipment we allocate to your project will deliver the best practicable result.
BRIGHT IDEAS
Our experienced team often introduce cost-saving alternatives.
.
FLEXIBLE & ADAPTABLE
We offer various methods of drilling to cater for site-specific restrictions, such as noise, water and space.
HERITAGE EXPERIENCE
We have a strong understanding of heritage sites and can be sensitive to their specific requirements.
UNDER CONTROL
We offer proven controls of slits and discharge water, especially in sensitive areas. We also have a strong health and safety policy and track record.
TESTING AVAILABLE
We can arrange a variety of tests to satisfy consent and client volume requirements.
PROJECTS
CHRISTCHURCH TOWN HALL
Our collaborative approach ensured a 'no surprises' outcome for this water bore heating system project, which was part of a $127 million restoration project.
THE TERRACE
The Terrace Building Complex on Hereford St will feature two geothermal 250NB abstraction bores to a depth of 85mbgl and two 250NB re-injection bores.
KING EDWARDS BARRACKS
One 300NB abstraction bore and one 300NB re-injection bore are being installed for this geothermal project with Hawkins Construction on Hereford St.
TAIT CAMPUS
We completed this project in April 2014. Our assistance and advice in the layout of the system to help minimise heat circulation ,given the close proximity of the bores, was a notable feature of this project.
CHRISTCHURCH BUS EXCHANGE
Abstraction and re-injection bores for the new Bus Exchange complex on Christchurch's Tuam St were completed on schedule and within budget.
ENVIRONMENT CANTERBURY
During our involvement in the Environmental Canterbury geothermal heat pump system installation, we were able to offer the client a number of cost-saving measures.
UNIVERSITY OF CANTERBURY
Innovative thinking and creative solutions were required to successfully and efficiently complete the University of Canterbury air conditioning project.
CHRISTCHURCH AIRPORT DATA CENTRE
Limited site access saw us bring in cable tool methods for this air conditioning project at Christchurch Airport Data Centre.
CHRISTCHURCH ARTS CENTRE
Site-specific measures are being undertaken to protect these heritage buildings within the Christchurch Arts Centre for this extensive air conditioning project.