//TAIT CAMPUS
TAIT CAMPUS 2017-06-06T13:47:02+12:00

Project Description

TAIT CAMPUS

Project involvement:

Sub-contractor

Location:

Christchurch

McMillan Drilling successfully tendered for the construction of the abstraction and re-injection bores for the new Tait Campus. This project was completed in April 2014 and consists of a single 250NB abstraction bore to a depth of 50mbgl and a single 200NB re-injection bore to 25mbgl. We offered assistance and advice in the layout of the system to help minimise heat circulation, given the close proximity of the bores.