Project Description
TAIT CAMPUS
Project involvement:
Sub-contractor
Location:
Christchurch
McMillan Drilling successfully tendered for the construction of the abstraction and re-injection bores for the new Tait Campus. This project was completed in April 2014 and consists of a single 250NB abstraction bore to a depth of 50mbgl and a single 200NB re-injection bore to 25mbgl. We offered assistance and advice in the layout of the system to help minimise heat circulation, given the close proximity of the bores.