Our collaborative approach ensured a 'no surprises' outcome for this water bore heating system project, which was part of a $127 million restoration project.
LYTTELTON PORT
Mothership 2017-06-06T11:43:48+12:00McMillan have carried out in-depth investigation into ground conditions at the port and in the reclaimed land area.
PEGASUS TOWNSHIP WATER SUPPLY
Mothership 2017-06-06T12:20:26+12:00Extensive exploration work was required to secure a reliable high-quality water supply for the new Pegasus township.
METRO SPORTS FACILITY
Mothership 2017-06-06T11:44:37+12:00A contaminated post-earthquake site required detailed geotechnical and environmental investigation.
DARFIELD WATER SUPPLY
Mothership 2017-06-06T11:54:38+12:00Darfield township's bid to move to groundwater only supply offered time and cost-saving benefits.
CLEARWATER RESORT
Mothership 2017-06-21T11:29:53+12:00To gain an understanding of the lithological profile and soil engineering parameters for ground modelling.
THE TERRACE
Mothership 2017-06-06T13:45:12+12:00The Terrace Building Complex on Hereford St will feature two geothermal 250NB abstraction bores to a depth of 85mbgl and two 250NB re-injection bores.